A Real Number, in Seconds — Not a Follow-Up Call

Your client asks "roughly what would this cost to build?" in the first meeting. Now you have an answer on the spot, without waiting on us or guessing wrong. Use this calculator live with clients, or send them the link directly.

Calibrated to current Lower Mainland construction costs — Metro Vancouver & the Fraser Valley.

How We Work With Design Partners

We're built to be brought in at the start of a project, not after the drawings are done. When we're introduced during planning, we manage and oversee the entire pre-construction phase — permitting, budgeting, scheduling, consultant coordination — at no additional cost to you or your client. You keep control of the design. We handle the execution and the fixed price that makes it real.

Custom Home Cost Calculator

What Will Your Custom Home Cost?

A rough estimate based on your square footage, finish level, and the features that matter to you. For an exact number, we'll walk your lot and give you a fixed price.

Standard
~$550/sq ft
Premium
~$850/sq ft
Luxury
~$1,200/sq ft
Standard
  • Laminate or engineered hardwood flooring
  • Quartz countertops
  • Stock cabinetry, semi-custom finishes
  • Standard windows, single-zone HVAC
Premium
  • Wide-plank hardwood throughout
  • Quartz or natural stone countertops
  • Custom cabinetry, upgraded hardware
  • High-efficiency windows, zoned HVAC
Luxury
  • Natural hardwood & imported stone flooring
  • Book-matched natural stone countertops
  • Fully custom millwork throughout
  • Triple-glazed windows, full climate control

What is Step Code, and why does it affect cost? The BC Energy Step Code is a province-wide performance standard (Steps 1–5) that sets increasingly strict energy-efficiency requirements for new construction. Each step up requires real, priced changes to the build — thicker wall and roof insulation, higher-performance (often triple-glazed) windows, more airtight construction with mandatory blower-door testing, upgraded mechanical systems, and third-party energy modelling to prove compliance before a permit is issued. None of that is optional once a municipality adopts a step level, which is why a Step 5 requirement (like the North Shore) genuinely costs more to build than a Step 3 project of the same size and finish.

Step Code levels shown are current as of early 2026 and are set by municipal bylaw — subject to change. Confirm requirements for your specific project and permit date before design work begins.

Flat Lot
Standard
Sloped Lot
+10%
View / Waterfront
+15%
Modern / Contemporary
Most cost-effective
Clean lines, flat rooflines, expansive glass
Craftsman
Baseline
Gabled roofs, natural wood, exposed beams
Modern Farmhouse
+8%
Board-and-batten siding, black-framed windows
Transitional
+15%
Blends classic detailing with modern simplicity
West Coast Modern
+20%
Post-and-beam timber, structural glass walls, natural stone
Mediterranean / Chateau
Most expensive
Stucco, tile roofing, arches, custom stonework
Unfinished
Driveway only
Move-in ready — landscaping left for you to finish later
Standard
~$20/sq ft
Sod, basic planting, minimal hardscape
Premium
~$40/sq ft
Detailed planting, irrigation, lighting, some hardscape
Luxury
~$75/sq ft
Extensive hardscaping, retaining walls, custom stonework

Feature costs shown are planning-stage estimates, not final pricing. Every feature's real cost depends on decisions made during architecture, design, and engineering — site conditions, structural requirements, and material selections all move the number once your project is actually drawn and engineered. These figures exist to help you plan, not to be held to before that work is done.

Added features can extend the timeline too, not just the price. A pool, helipad, or private gate can trigger additional variance applications or environmental review during permitting. An elevator, home theatre, or wine cellar adds specialized trades and inspections to the construction schedule. Sauna, cold plunge, and outdoor kitchen installations need to be sequenced around plumbing and electrical rough-in. None of this is a reason to skip a feature you want — it's just why your actual schedule gets finalized once your specific feature list is known, not from this calculator alone.

Estimated Build Cost
$1,470,000 – $1,715,000
This is a rough estimate for planning purposes only. Final pricing depends on your lot, permitting, and design details — book a call for a fixed-price quote.
Estimated Timeline
Planning & Permitting
7–10 months
Construction
13–16 months
18–22 months total (permitting to move-in)
Apply to Build With Us

Are you one of Mavish Homes' next three home builds? See our promotion

How Do You Get a Fixed-Price Quote?

This calculator gives you a real starting number. Here's what actually happens between this estimate and a contract you can trust.

01
A Planning Retainer Secures Your Slot
A planning retainer reserves your place in our build pipeline and puts your project into motion. It's applied directly to your build — it isn't a fee on top of your home, it's the start of it.
02
We Manage Planning & Design at No Extra Cost
From that point, we manage and oversee your entire planning and design phase — architecture coordination, engineering, permitting, and real supplier pricing — at no additional cost to you. This is where an accurate fixed price actually comes from.
03
You Receive a Fixed-Price Contract
Once planning is complete and drawings are real — not assumed — we give you one number and one timeline. No surprise change orders, no "final cost" that keeps moving.
Larger Projects Take Longer to Plan — and That's Normal

The bigger and more complex the home, the longer the planning and permitting phase takes. A straightforward build might be ready for a fixed price in a few months. A large, highly custom project — especially one with a difficult lot, a higher Step Code requirement, or an ambitious feature list — can take up to two years of planning before every drawing, engineering report, and permit is finalized.

On projects that long, we don't ask you to wait two years before anything happens. Early physical work that doesn't depend on final drawings — demolition, excavation, and site preparation — can move forward under a partial cost-plus arrangement while design and engineering continue in parallel. A full fixed-price quote is then issued once the design is locked, typically heading into the finishing phase, when every material and system is actually known.

The Real Cost of Working With the Wrong Contractor

Most horror stories in custom home building don't start on the job site — they start months earlier, when a project moves into permitting or construction without accurate drawings, real pricing, or a genuine read on site conditions. What follows is predictable: timelines that were never realistic in the first place, "estimates" that quietly become 20–30% higher, constant change orders, and delays that stack on top of each other until a one-year build becomes two.

This isn't a small inconvenience. It's your money, your time, and often years of your life spent managing a project that was set up to go wrong from the start.

This is likely the single biggest investment you'll ever make. It deserves to be planned properly, priced accurately, and built by someone who's already done the hard part before you sign anything — not figured out as you go.

Start With a Planning Retainer

Common Questions From Design Partners

Can our client keep their own architect or designer through construction?
Yes. We build to your drawings and specifications — you stay the design lead throughout the project, from permitting through final walkthrough.
How do changes get handled once we're at a fixed price?
Any change outside the original scope is priced and approved before it happens — no surprise invoices, and no pressure to cut a corner to protect the number.
Do you work with outside consultants we already have relationships with?
Absolutely. If you have engineers, consultants, or trades you trust, we coordinate around them rather than replacing them by default.
What do you need from us to get an accurate number?
Early on, even rough square footage and a sense of finish level is enough for a ballpark. Once drawings exist, we can give you a real fixed price.
For Architects

Bring us in during planning and we'll manage pre-construction at no cost to your client.

For Designers

Send your clients a real number instantly, and let us handle the execution behind your design.

Who You're Actually Working With

Mark — Founder, Mavish Homes
  • BCIT-trained carpenter
  • Former project manager for a local luxury custom home builder
  • Fully licensed, certified builder
  • 15 years in the construction industry
  • Relentless focus on self-improvement, health, fitness, and wellbeing
  • Leader and mentor of The Founders Standard, teaching other founders the importance of discipline and a well-balanced life
  • Hosts a community walk every Wednesday morning at 6:45am around beautiful Deer Lake in Burnaby

This isn't a builder chasing volume. It's someone genuinely dedicated to living the most beautiful, fulfilling life British Columbia has to offer — and building that same standard into every home and every relationship along the way.

What Kind of Relationship Do You Get With Mavish Homes?

The number one goal of our entire business isn't the square footage, and it isn't even the finished home — it's a long-lasting, vibrant, healthy relationship that outlives the build. We treat our clients the way great friends and family treat each other: occasional lunches, a round of golf, taking the motorcycles out for a ride and lunch together. We're not here to build your home and disappear once the keys are handed over. We're here to create a real connection, one that's still there long after move-in day.

For Homeowners

Partnering with Mavish Homes from the very beginning means you're not guessing on who to hire. We recommend our highly vetted architects and designers for your project, so you're never left sourcing and screening a team on your own — you're working with people we already trust and have built with before.